Case Study: Q&D Construction-Energy Division

quote

The FH-R material placement attachment cut a 4-step process down to just 2 steps. Rather than dumping material on the road and pushing it with equipment then having to clean up after, the FH-R makes it possible to put material directly where it needs to go in an efficient and accurate manner. I estimate the FH-R has boosted our operational efficiency by at least 15% and improved production timelines by up to 25% – all while maintaining high-quality work. It also decreased the impact to traffic as the attachment is compact and only requires us to close one lane of traffic.”

– David (Homer Dale) Wix, Superintendent at Q&D Construction-Energy Division

FH-R material placement attachment