Case Study: Ultimate Internet Access Inc.

quote

After demoing the FH-R material placement attachment for a day, we were impressed with the results and decided to purchase one. Since then, I have continued to be happy with the ways the FH-R has boosted efficiency as we install 1-gig fiber for high-speed internet. The FH-R allows us to place asphalt exactly where we need it, eliminating a lot of shoveling and hand work. Less shoveling means less manual labor required which allowed us to double the production time with half the crew. The simplicity of this attachment makes it reliable and user-friendly. It operates exactly as advertised and we expect it to continue to be a tremendous asset to our operation.”

– John Zuber, Chief Instruction Officer at Ultimate Internet Access Inc.

FH-R material placement attachment doing utility trench backfill

READY TO BACKFILL TRENCHES FASTER?

Share this post

Start typing and press Enter to search

Shopping Cart